PROJECT PORTFOLIO:
Cloak Room to Shower Conversion – HA6
A cloak room to walk-in shower conversion in HA6, involving a full strip-out, reconfigured plumbing and electrics, waterproofing, tiling, and installation of modern sanitaryware.












image-slider-with-thumbnail2.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE












Project Steps







image-slider-with-thumbnail1.jpeg
Strip-Out & Floor Exposure
Existing floor finishes removed to expose the subfloor and allow plumbing and drainage alterations.
image-slider-with-thumbnail2.jpeg
External Drainage Connection
New waste pipework connected to the external soil stack to support the revised WC and shower layout.
image-slider-with-thumbnail2.jpeg
Electrical First Fix & Insulation
Wiring and insulation installed ahead of ceiling finish.
image-slider-with-thumbnail2.jpeg
Plumbing First Fix
Services set in place ahead of tiling and second fix.
image-slider-with-thumbnail2.jpeg
Tanking & Waterproofing Prep
Shower area prepared for full tanking system to ensure long-term waterproof protection.
image-slider-with-thumbnail2.jpeg
Wall & Floor Tiling in Progress
Tile layout set and aligned around plumbing connections.
image-slider-with-thumbnail2.jpeg
Towel Rail First Fix
Pipework positioned and set out accurately in preparation for towel rail installation.







Finished Bathroom