  • Case Study 1

    Bathroom Renovation N12

    Structural bathroom renovation involving removal of internal walls, reconfigured plumbing and soil runs, upgraded electrics, full waterproofing, tiling, and complete installation.

  • Case Study 2

    Full Bathroom Makeover – London

    Complete bathroom refurbishment with reconfigured plumbing, electrics, bespoke carpentry, full waterproofing, tiling, and high-quality fixture installation.

  • bathroom renovation - bath to shower

    Case Study 3

    Bath-to-Shower Conversion – EN6

    Bath-to-shower conversion incl. full strip-out, reinforced flooring, reconfigured plumbing and electrics, upgraded drainage, waterproofing, tiling, and walk-in shower installation.

  • Two Bathrooms Combined Into One Family Bathroom – HP3

    Case Study 4

    Two Bathrooms Combined Into One Family Bathroom – HP3

    Two bathrooms combined into one space by removing the dividing wall, reworking plumbing and electrics, upgrading ventilation, full waterproofing, tiling, and fixture installation.

  • Bathroom shower leaking through ceiling full repair work

    Case Study 5

    Shower Leaking Through Ceiling Repair – WD18

    Shower leaking through ceiling repair involving strip-out, tray and waste reinstatement, plumbing, tanking waterproofing, retiling and enclosure installation.

  • Kitchen Refurbishment with New Gas Run – WD19

    Case Study 6

    Kitchen Refurbishment with New Gas Run – WD19

    Full kitchen re-fit with new gas run, chased electrics, extended plumbing, and tiled splashback.

  • Full Bathroom Renovation with New Bath and Separate Shower Installation

    Case Study 7

    Full Bathroom Renovation HA4

    Bathroom reconfiguration with floor access, new waste runs, concealed pipework and separate shower installation.