BATHROOM Installation
PROJECT OVERVIEW
Removal
Bathroom removed, and all rubbish disposed of.
Plumbing
Completed first fix, installed thermostatic shower, plumbed basin and bath taps, and repositioned radiator.
Installation
Fitted shower pack with overhead shower and hose, vanity basin, back-to-wall toilet, LED mirror cabinet, bath, panel, and screen. Replaced extractor fan, added door stop, and completed tiling and finishing.
Electrical Works
Removed pull switch, added external switch, connected mirror cabinet electrics, and adjusted ceiling downlights.