• Modern bathroom renovation HA4
  • bathroom before

Full bathroom renovation with modern fittings

LOCATION:
HA4

DETAILS:

DEMOLITION & PREP:

  • Complete strip-out of bath, basin, WC, wall tiles, and flooring
  • Reuse of existing mirror and towel rail
  • Protective setup and waste cleared via on-site skip

PLUMBING:

  • WC relocated 500mm to optimise layout
  • Concealed dual-outlet shower system installed
  • Shower pump added for improved water pressure

ELECTRICALS:

  • New ceiling pull switch and shaver socket fitted
  • Wiring upgraded to meet Part P compliance

TILING:

  • Full-height wall tiling and tiled floor throughout
  • Shower zone fully waterproofed and finished with trim detailing

INSTALLATION:

  • Slimline tray and dual shower (rainfall + handheld)
  • Wall-hung vanity, WC in new location
  • Towel rail and mirror reinstalled in updated layout