PROJECT PORTFOLIO:
Full Bathroom Renovation – HP6
Full bathroom refurbishment retaining the original layout, with a new bath, WC and vanity, full-height tiling, and a fitted Shaker-style furniture run.




image-slider-with-thumbnail1.jpeg
AFTER
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail2.jpeg
BEFORE
image-slider-with-thumbnail1.jpeg
AFTER




Project Steps







image-slider-with-thumbnail1.jpeg
SUBFLOOR EXPOSED
Boards lifted to check for damp and rot before re-boarding.
image-slider-with-thumbnail1.jpeg
FIRST FIX PLUMBING
New flexible tap connectors routed ready for the basin and WC.
image-slider-with-thumbnail1.jpeg
SETTING OUT
Marking fixture positions on the subfloor ahead of final fit.
image-slider-with-thumbnail1.jpeg
STRIP OUT COMPLETE
Old flooring and boxing removed, revealing the subfloor and structure beneath.
image-slider-with-thumbnail1.jpeg
DAMP & ROT FOUND
Areas of rotten timber uncovered during strip-out, marked up for repair.
image-slider-with-thumbnail1.jpeg
TIMBER DAMAGE CLOSE-UP
A closer look at the decayed stud caused by long-term hidden damp.
image-slider-with-thumbnail1.jpeg
RE-BOARDING & REPAIRS
Damaged sections patched and new waste pipework fitted ahead of tiling.







Finished Bathroom
BOOK CONSULTATION
No doubt you have many questions… don’t worry.
We are here to advise and support you throughout the process.















































